City of Saginaw, Michigan

 


Improving our roads has been and will continue to be a key priority for the City of Saginaw.  Better roads enhance travel and safety in our neighborhoods and ultimately lead to the long-term greater good of our community. In an effort to inform citizens of current road projects, closures, and the impact on travel throughout Saginaw, the City has created this interactive construction project dashboard to help residents and travelers navigate the city’s planned projects.  All primary road projects that are scheduled for the City of Saginaw are included on the map and lists below.  To learn more about each project, click on the project  name listed in the left hand margin. Project timeline and completion dates are estimated and can be impacted by several variables including weather, material availability and site conditions. Additional projects may be added to the map and lists throughout the year. For questions concerning these projects, contact our Engineering Division at (989) 759-1410.


Click on project name to zoom to location on the map.

temporary road closures
1b-road-work-ahead-SMJANES AVE. ROAD CLOSURE BETWEEN S. WASHINGTON/M-13 AND GENESEE

City crews will continue making permanent road repairs within the right-of-way on Janes Avenue, between South Washington Avenue/M-13 and East Genesee Avenue, requiring a road closure to be extended until Friday, July 1st at 4:00pm. During this time, the eastbound and westbound lanes will continue to be closed to through traffic. Please follow the detour setup or seek an alternate route if possible. Residents are urged to bypass this portion of Janes Avenue, and the City of Saginaw asks motorists to please be patient while the work is in progress.


1b-road-work-ahead-SMEZRA RUST DR LANE CLOSURES BETWEEN FORDNEY AND S. WASHINGTON

City crews will continue making permanent road repairs within the right-of-way on Ezra Rust Drive, between Fordney Street and South Washington Avenue/M-13, requiring lane closures to be extended until Friday, July 1st at 4:00 p.m. During this time the two eastbound lanes and two westbound lanes will continue to be reduced to one lane in each direction; traffic will be shifted at the worksite. Please seek an alternate route if possible. Residents are urged to bypass this portion of Ezra Rust Drive, and the City of Saginaw asks drivers to please be patient while the work is in progress. 


1b-road-work-ahead-SMDAVENPORT AVE./M-58 LANE CLOSURE BETWEEN N. BOND AND HILL

Contract crews will be performing utility work within the right-of-way on Davenport Avenue/M-58, between North Bond Street and Hill Street, requiring a lane closure on Monday, June 27th from 9:00 a.m. until Friday, July 1st at 3:00 p.m. During this time the three westbound lanes will be reduced to two lanes; traffic will be shifted at the worksite. Please seek an alternate route if possible. Residents are urged to bypass this portion of Davenport Avenue/M-58, and the City of Saginaw asks drivers to please be patient while the work is in progress. 


1b-road-work-ahead-SMWEISS STREET INTERMITTENT LANE SHIFTS BETWEEN N. BOND AND HERMANSAU

Contract crews will be performing sidewalk repairs within the right-of-way on Weiss Street, between North Bond Street and Hermansau Street, requiring intermittent lane shifts starting on Monday, June 27th from 7:00 a.m. until Friday, July 1st at 5:00 p.m. During this time the eastbound and westbound lanes will be shifted into the center turn lane at various times; traffic will be shifted at the worksite. Please seek an alternate route if possible. Residents are urged to bypass this portion of Weiss Street, and the City of Saginaw asks drivers to please be patient while the work is in progress. 


CONSTRUCTION PROJECTS


1c-under-construction-SM
BAUM STREET SURFACE LOT - NONE - 01/18/2022 - 06/17/2022
Parking lot construction



1c-under-construction-SM
12TH STREET RESURFACING - PERKINS STREET TO JANES AVE - 05/02/2022 - 07-08-2022
 Road resurfacing and ADA sidewalk ramps.



1c-under-construction-SM
WADSWORTH AVENUE RECONSTRUCTION - Lake State Rail Yard to Vets Memorial PARKWAY - 04/25/2022 - 08/19/2022

Road reconstruction, ADA sidewalk ramps, drainage improvements, and water main improvements



1c-under-construction-SM
E. REMINGTON STREET CONCRETE REPAIRS - WATER ST TO S. WASHINGTON AVE. (M-13) - 01/18/2022 - 06/17/2022
Road reconstruction, ADA sidewalk ramps and drainage improvements


1c-under-construction-SM
S. 12TH ST - PERKINS ST TO JANES AVE - 05/02/2022 - 07/08/2022
Road resurfacing and ADA sidewalk ramps



1c-under-construction-SM
WALNUT ST - S. 11TH ST TO S. 16TH ST - 05/02/2022 - 07/08/2022

ADA sidewalk ramps


1c-under-construction-SM
LAPEER AVE - ROOSEVELT AUSTIN TO N 6TH - 05/02/2022 - 09/16/2022

Road reconstruction, ADA sidewalk ramps, drainage improvements, water main improvements.


1c-under-construction-SM
W. HOLLAND AVE - N. WOODBRIDGE - 05/02/2022 - 09/16/2022

Road reconstruction, ADA sidewalk ramps, drainage improvements, water main improvements.